-

31
2025-12
Kamoa-Kakula Copper Smelter in DRC Starts Prod...
At 14:00 p.m. on December 29, local time, as the broiling Anode copper slowly flowed out of the anode furnace and was successfully cast into the first batch of anode plates, the 500ktpa Kamoa-Kakula Copper Smelter in the Democratic Republic of the Congo (DRC) operating with the Dir
-

08
2025-12
Kamoa-Kakula Copper Smelter in DRC, for Which ...
The 500ktpa Kamoa-Kakula Copper Smelter in the Democratic Republic of the Congo (DRC) operating with the single-stage direct to blister process, for which China Nerin provided full EPCM services, has officially fired up its furnaces for heating up recently. This milestone marks the
-

08
2025-12
China Nerin Wins the Slag Slow Cooling Yard In...
On December 1st, Jiangxi Nerin Electrical & Automation Co., Ltd., a wholly-owned subsidiary of China Nerin, successfully won the bid for the Slag Slow Cooling Yard Intelligent System under the Comprehensive Recovery Technology Upgrading, Relocation, and Expansion Project of
-

19
2025-11
Simandou Iron Ore Project, with China Nerin Pr...
On November 11, the launch ceremony for the world-class Simandou iron ore project, for which China Nerin provided on-site technical support, digital delivery, and project supervision, was held at the Port of Morebaya in Guinea. The event was attended by Liu Guozhong, Special Repres
-

28
2025-10
China Nerin and Rio Tinto Group signed Memoran...
On October 27, China Nerin Engineering Co., Ltd. (hereinafter referred to as "China Nerin") and Rio Tinto Group (hereinafter referred to as "Rio Tinto"), a leading global mining company, officially signed a Memorandum of Understanding (“MoU”) o
-

30
2025-09
China Nerin Attended the 4th Global Digital Tr...
From September 25 to 29, the 4th Global Digital Trade Expo (GDTE), co-hosted by the People's Government of Zhejiang Province and the Ministry of Commerce of the People's Republic of China, was successfully held in Hangzhou. The event attracted 154 countries and regions, 33 internat